Lincoln Technical institute
This project transformed the existing ground surface into a new, fully accessible concrete ramp through extensive demolition, excavation, and reconstruction. Our scope included new foundation walls, slab-on-grade and thickened concrete slabs, equipment pads, sidewalks, curbs, bollards, and concrete patching, along with CMU wall construction and masonry repairs. From site preparation to the finished concrete work, every phase was completed with precision to deliver a durable, functional, and long-lasting solution.